Talked with SR and there is no issue with CTI being backed up, although he said he would try to push for an earlier appointment if possible.

We sent in our guardian options, only selected surround sound (basic package) and HDMI rough in for the basement.  No pressure at all from staff and all we had to do was send in a sketch of where we wanted the items located.

We were unable to get the wet bar location moved, although we did try and SR was on board with moving it next to basement bathroom.  I guess the PM did not want to deal with it, so we saved 1,200 for doing the rough in.  We will most likely add in a dry bar with fridge and storage at a later time. For now, we can use the extra money on flooring!!!